经济代写|微观经济学代写Microeconomics代考|Information of the Contractor

如果你也在 怎样代写微观经济学Microeconomics这个学科遇到相关的难题,请随时右上角联系我们的24/7代写客服。

微观经济学是研究稀缺性及其对资源的使用、商品和服务的生产、生产和福利的长期增长的影响,以及对社会至关重要的其他大量复杂问题的研究。

statistics-lab™ 为您的留学生涯保驾护航 在代写微观经济学Microeconomics方面已经树立了自己的口碑, 保证靠谱, 高质且原创的统计Statistics代写服务。我们的专家在代写微观经济学Microeconomics代写方面经验极为丰富,各种代写微观经济学Microeconomics相关的作业也就用不着说。

我们提供的微观经济学Microeconomics及其相关学科的代写,服务范围广, 其中包括但不限于:

  • Statistical Inference 统计推断
  • Statistical Computing 统计计算
  • Advanced Probability Theory 高等概率论
  • Advanced Mathematical Statistics 高等数理统计学
  • (Generalized) Linear Models 广义线性模型
  • Statistical Machine Learning 统计机器学习
  • Longitudinal Data Analysis 纵向数据分析
  • Foundations of Data Science 数据科学基础

经济代写|微观经济学代写Microeconomics代考|Information of the Contractor

Contractors can only react to the demand from owners. Typically, they are well informed about the owners’ activities in their area. This is part of the acquisition efforts. It is also in the interest of the owner to make their intentions known to create a thick market. Through participation in submissions, contractors usually know very well the general price level of their competitors. They do not know the details of the competitors’ estimates, nor their underlying chosen construction technology.

During contract negotiations, a contractor faces an owner with access to detailed information from all submitted estimates, while he only knows his own estimate. In contract negotiations, an owner will typically pressure a contractor to lower the price by referring to the overall price of competitors or the comparative prices of certain items. The contractor is in no position to ascertain the truth of the owner’s statements and cannot talk to the other competitors (collusion). This is an especially unbalanced situation so the estimate is just that: a price idea without certainty. The information of the contractor is much more limited and ambiguous than that of the owner. Contractors drop out of the bargaining process when they feel that the price does not cover the costs; they are not sure about it.

Figure 11.3 sums up the information situation of the owner with full and detailed information about all offers. The contractor is not in a similar situation; he has only part of the information that the owner has and all other possible projects on the market are just that possibilities or prospects (Figure 12.8). Contractors must decide under highly ambiguous circumstances.

Once the two parties sign the contract, the information advantage shifts to the contractor. Even if the owner or a couple of his representatives supervise the site continuously, they will not have all the full information that the contractor can access. The breadth and depth of information that is available to the contractor is not obtainable to the owner. Labor productivity is one example. Many contractors use a reporting system with daily updates for the work completed by each worker, which in turn allows calculating productivity (output/ hour). This information remains privy to the contractor.

经济代写|微观经济学代写Microeconomics代考|Contractor Pricing

The practice of estimating varies across the world and among firms in a given country. Every firm can determine the submission price in any way it deems suitable.

Having stated this, there are probably three main approaches: (i) parametric pricing, (ii) unit pricing, and (iii) resource pricing. The degree of detailing increases from (i) to (iii) and the information requirements also increase in the same direction.

Parametric pricing uses information from completed projects and is only tentatively adjusted to the project at hand. It is based on a price per unit, most often $\$ / \mathrm{m}^2$, sometimes $\$ / \mathrm{m}^3$. Minimal adjustments are made according to the required quality.

Unit pricing refers to the prices of parts of the structure such as walls, slabs, windows, or heating systems. Prices are again per unit of wall $\left(\mathrm{m}^2\right)$ or door (piece). Quality adjustments can now be made on the level of units. There is no need for an average quality assumption for the structure. Again, the price information is taken from the past and not much adjusted to a specific project.

Resource pricing still requires more information. A wall consists maybe of ready-made concrete, rebars, and tying wire. Formwork with ties and supports guarantees the required shape. Labor is necessary to erect the formwork, to cut, fix, and tie the rebars and to pour and compact the concrete. A crane transports the heavier materials, a pump might place the concrete and vibrators will compact it. In resource pricing, all this is considered separately, including loading, storage, and transportation costs. A single item such as labor for pouring concrete cannot be estimated with greater accuracy than parameters, but misjudgments will tend to cancel each other out. The secret of resource pricing lies in the fact that the project is broken down into as many items as possible and each item will be priced independently to the best knowledge of the estimator. The prices will be inaccurate but if there is no bias, they will also be uniformly distributed. Overall, this enforces the tendency to determine costs in such a way that the overall difference between planned (estimate) and actual (execution on site) becomes small.

Several studies at the University of Applied Sciences Bremen showed that for all single units there were differences between planned and actual costs typically by $\pm 20 \%$. However, the variation of the contract price was in the range of $\pm 2 \%$. The projects were typical building projects of no great complexity. Depending on complexity, these variations can be much larger. I have participated in a tunnel project where the construction costs to the contractor were more than three times higher than the contract price; another tunnel project had a cost difference of $€ 100$ million and a transportation project a loss of $€ 400$ million to the contractor. Such data are typically private, the press publishes only cost overruns for the owner (Flyvbjerg et al. 2003).

微观经济学代考

经济代写|微观经济学代写Microeconomics代考|Information of the Contractor

承包商只能对业主的要求作出反应。通常,他们非常了解所有者在其所在地区的活动。这是收购工作的一部分。让业主知道他们的意图以创造一个密集的市场也符合业主的利益。通过参与提交,承包商通常非常了解竞争对手的一般价格水平。他们不知道竞争对手估算的细节,也不知道他们选择的基础施工技术。

在合同谈判期间,承包商面对的业主可以访问所有提交的估算的详细信息,而他只知道自己的估算。在合同谈判中,业主通常会通过参考竞争对手的整体价格或某些项目的比较价格来迫使承包商降低价格。承包商无法确定业主陈述的真实性,也无法与其他竞争对手交谈(共谋)。这是一个特别不平衡的情况,所以估计只是:一个不确定的价格想法。承包商的信息比业主的信息更加有限和模糊。当承包商觉得价格不能弥补成本时,他们会退出谈判过程;他们不确定。

图 11.3 总结了所有者的信息情况,其中包含所有报价的完整详细信息。承包商没有类似情况;他只有所有者拥有的部分信息,市场上所有其他可能的项目都只是这种可能性或前景(图 12.8)。承包商必须在高度模棱两可的情况下做出决定。

一旦双方签订合同,信息优势就转移给承包商。即使业主或他的几个代表持续监督现场,他们也不会拥有承包商可以访问的所有完整信息。业主无法获得承包商可用的信息的广度和深度。劳动生产率就是一个例子。许多承包商使用报告系统,每天更新每个工人完成的工作,这反过来又可以计算生产率(产出/小时)。此信息对承包商保密。

经济代写|微观经济学代写Microeconomics代考|Contractor Pricing

估算的做法在世界各地和特定国家的公司之间各不相同。每个公司都可以以其认为合适的任何方式确定提交价格。

话虽如此,可能存在三种主要方法:(i) 参数定价,(ii) 单位定价,以及 (iii) 资源定价。详细程度从 (i) 到 (iii) 增加,信息需求也向同一方向增加。

参数定价使用来自已完成项目的信息,并且只是暂时根据手头的项目进行调整。它通常基于单位价格$/米2, 有时$/米3. 根据所需的质量进行最小的调整。

单价是指结构部分的价格,例如墙壁、楼板、窗户或供暖系统。价格也是每单位墙(米2)或门(件)。现在可以在单位级别进行质量调整。不需要对结构进行平均质量假设。同样,价格信息取自过去,并没有针对特定项目进行太多调整。

资源定价仍然需要更多信息。墙可能由现成的混凝土、钢筋和绑扎线组成。带拉杆和支架的模板保证了所需的形状。需要人工来架设模板,切割、固定和系紧钢筋,以及浇筑和压实混凝土。起重机运输较重的材料,泵可能放置混凝土,振动器将其压实。在资源定价中,所有这些都是单独考虑的,包括装载、存储和运输成本。诸如浇筑混凝土的劳动力之类的单个项目无法比参数更准确地进行估算,但误判往往会相互抵消。资源定价的秘诀在于将项目分解为尽可能多的项目,并且每个项目都将根据估算人员的最佳知识独立定价。价格会不准确,但如果没有偏差,它们也会均匀分布。总的来说,这加强了以计划(估计)和实际(现场执行)之间的总体差异变小的方式确定成本的趋势。

不来梅应用科学大学的几项研究表明,对于所有单个单元,计划成本和实际成本之间通常存在差异±20%. 然而,合同价格的变化范围是±2%. 这些项目是典型的建筑项目,并不复杂。根据复杂性,这些变化可能会大得多。我参与过一个隧道项目,承包商的建设成本比合同价格高出三倍以上;另一个隧道项目的成本差异为€€100万元和一个交通项目亏损€€400万给承包商。此类数据通常是私有的,新闻界只会为所有者发布成本超支情况(Flyvbjerg 等人,2003 年)。

经济代写|微观经济学代写Microeconomics代考 请认准statistics-lab™

统计代写请认准statistics-lab™. statistics-lab™为您的留学生涯保驾护航。

金融工程代写

金融工程是使用数学技术来解决金融问题。金融工程使用计算机科学、统计学、经济学和应用数学领域的工具和知识来解决当前的金融问题,以及设计新的和创新的金融产品。

非参数统计代写

非参数统计指的是一种统计方法,其中不假设数据来自于由少数参数决定的规定模型;这种模型的例子包括正态分布模型和线性回归模型。

广义线性模型代考

广义线性模型(GLM)归属统计学领域,是一种应用灵活的线性回归模型。该模型允许因变量的偏差分布有除了正态分布之外的其它分布。

术语 广义线性模型(GLM)通常是指给定连续和/或分类预测因素的连续响应变量的常规线性回归模型。它包括多元线性回归,以及方差分析和方差分析(仅含固定效应)。

有限元方法代写

有限元方法(FEM)是一种流行的方法,用于数值解决工程和数学建模中出现的微分方程。典型的问题领域包括结构分析、传热、流体流动、质量运输和电磁势等传统领域。

有限元是一种通用的数值方法,用于解决两个或三个空间变量的偏微分方程(即一些边界值问题)。为了解决一个问题,有限元将一个大系统细分为更小、更简单的部分,称为有限元。这是通过在空间维度上的特定空间离散化来实现的,它是通过构建对象的网格来实现的:用于求解的数值域,它有有限数量的点。边界值问题的有限元方法表述最终导致一个代数方程组。该方法在域上对未知函数进行逼近。[1] 然后将模拟这些有限元的简单方程组合成一个更大的方程系统,以模拟整个问题。然后,有限元通过变化微积分使相关的误差函数最小化来逼近一个解决方案。

tatistics-lab作为专业的留学生服务机构,多年来已为美国、英国、加拿大、澳洲等留学热门地的学生提供专业的学术服务,包括但不限于Essay代写,Assignment代写,Dissertation代写,Report代写,小组作业代写,Proposal代写,Paper代写,Presentation代写,计算机作业代写,论文修改和润色,网课代做,exam代考等等。写作范围涵盖高中,本科,研究生等海外留学全阶段,辐射金融,经济学,会计学,审计学,管理学等全球99%专业科目。写作团队既有专业英语母语作者,也有海外名校硕博留学生,每位写作老师都拥有过硬的语言能力,专业的学科背景和学术写作经验。我们承诺100%原创,100%专业,100%准时,100%满意。

随机分析代写


随机微积分是数学的一个分支,对随机过程进行操作。它允许为随机过程的积分定义一个关于随机过程的一致的积分理论。这个领域是由日本数学家伊藤清在第二次世界大战期间创建并开始的。

时间序列分析代写

随机过程,是依赖于参数的一组随机变量的全体,参数通常是时间。 随机变量是随机现象的数量表现,其时间序列是一组按照时间发生先后顺序进行排列的数据点序列。通常一组时间序列的时间间隔为一恒定值(如1秒,5分钟,12小时,7天,1年),因此时间序列可以作为离散时间数据进行分析处理。研究时间序列数据的意义在于现实中,往往需要研究某个事物其随时间发展变化的规律。这就需要通过研究该事物过去发展的历史记录,以得到其自身发展的规律。

回归分析代写

多元回归分析渐进(Multiple Regression Analysis Asymptotics)属于计量经济学领域,主要是一种数学上的统计分析方法,可以分析复杂情况下各影响因素的数学关系,在自然科学、社会和经济学等多个领域内应用广泛。

MATLAB代写

MATLAB 是一种用于技术计算的高性能语言。它将计算、可视化和编程集成在一个易于使用的环境中,其中问题和解决方案以熟悉的数学符号表示。典型用途包括:数学和计算算法开发建模、仿真和原型制作数据分析、探索和可视化科学和工程图形应用程序开发,包括图形用户界面构建MATLAB 是一个交互式系统,其基本数据元素是一个不需要维度的数组。这使您可以解决许多技术计算问题,尤其是那些具有矩阵和向量公式的问题,而只需用 C 或 Fortran 等标量非交互式语言编写程序所需的时间的一小部分。MATLAB 名称代表矩阵实验室。MATLAB 最初的编写目的是提供对由 LINPACK 和 EISPACK 项目开发的矩阵软件的轻松访问,这两个项目共同代表了矩阵计算软件的最新技术。MATLAB 经过多年的发展,得到了许多用户的投入。在大学环境中,它是数学、工程和科学入门和高级课程的标准教学工具。在工业领域,MATLAB 是高效研究、开发和分析的首选工具。MATLAB 具有一系列称为工具箱的特定于应用程序的解决方案。对于大多数 MATLAB 用户来说非常重要,工具箱允许您学习应用专业技术。工具箱是 MATLAB 函数(M 文件)的综合集合,可扩展 MATLAB 环境以解决特定类别的问题。可用工具箱的领域包括信号处理、控制系统、神经网络、模糊逻辑、小波、仿真等。

R语言代写问卷设计与分析代写
PYTHON代写回归分析与线性模型代写
MATLAB代写方差分析与试验设计代写
STATA代写机器学习/统计学习代写
SPSS代写计量经济学代写
EVIEWS代写时间序列分析代写
EXCEL代写深度学习代写
SQL代写各种数据建模与可视化代写

发表回复

您的电子邮箱地址不会被公开。 必填项已用 * 标注