经济代写|微观经济学代写Microeconomics代考|General Characteristics
如果你也在 怎样代写微观经济学Microeconomics这个学科遇到相关的难题,请随时右上角联系我们的24/7代写客服。
微观经济学是研究稀缺性及其对资源的使用、商品和服务的生产、生产和福利的长期增长的影响,以及对社会至关重要的其他大量复杂问题的研究。
statistics-lab™ 为您的留学生涯保驾护航 在代写微观经济学Microeconomics方面已经树立了自己的口碑, 保证靠谱, 高质且原创的统计Statistics代写服务。我们的专家在代写微观经济学Microeconomics代写方面经验极为丰富,各种代写微观经济学Microeconomics相关的作业也就用不着说。
我们提供的微观经济学Microeconomics及其相关学科的代写,服务范围广, 其中包括但不限于:
- Statistical Inference 统计推断
- Statistical Computing 统计计算
- Advanced Probability Theory 高等概率论
- Advanced Mathematical Statistics 高等数理统计学
- (Generalized) Linear Models 广义线性模型
- Statistical Machine Learning 统计机器学习
- Longitudinal Data Analysis 纵向数据分析
- Foundations of Data Science 数据科学基础
经济代写|微观经济学代写Microeconomics代考|General Characteristics
Today’s markets (not only in construction) are mostly buyers’ markets. The buyers decide about the success of a firm. In times of product scarcity, markets can become sellers’ markets. This used to be the general case in communist countries and directly after the Second World War in Europe. The idea of supply and demand simultaneously determining quantity and price focuses on the interaction between buyer and seller. This balance shifts in construction toward the owner’s product design. Figure 12.11 describes how the product design determines the contractor’s output; the transformation direction is not from inputs (factors of production) to outputs (structure) but the inverse.
The production characteristics for contractors differ considerably from those for manufacturing of exchange goods (Table 12.4).
Separation of headquarters and sites lead to information and controlling problems. Assembly work requires daily transport of the workforce or on-site accommodation with impacts on private lives; transportation costs additional money and time; motivational influences are possible. Low equity puts constraints on financing factors of production; consequentially not the best but the available equipment is used. Differences in accounts sometimes lead to incomparable data sets. Small-batch, short-term purchases with delivery to variable sites increase costs and make logistics more complicated. Marketing (acquisition) before production is typical for contract goods and leads to all problems connected with asymmetric information, including opportunism. Project organizations are often more complex, do not allow to spread fixed costs, and as a consequence, do not warrant detailed planning nor purchase of specific asset. On demand, single batch and site production all increase production complexity; site production also depends on the weather. The integration of the owner causes multiple problems. He has to be aware of his contributions (process evidence) and must provide them on time. From the contractor’s point of view, the owner is a production factor from the owner’s perspective it is the opposite. Labor intensity of construction processes leads to an increased importance of motivation, skills, and information.
Some things are out of the contractors’ control. Owner behavior, soil conditions, and weather all influence the production process in unpredictable ways. The production results are stochastically distributed due to these outside influences. Motivation of the workforce also has a high and variable impact on production. Supply chain fragmentation affects production to a much larger degree than in manufacturing. The main influences on production are shown in Figure 12.12.
经济代写|微观经济学代写Microeconomics代考|Production Determinants
These process-oriented determinants are influenced by the location of production and the possibilities to support production. Features of these determinants are provided in Table 12.5.
The production line features a product that is assembled while moving from workstation to workstation. While the product moves, labor and equipment are stationary. Production lines require detailed planning and high investments. The activities at each workstation are repetitive. We can find production lines in construction only on megaprojects such as tunnels or bridges with a large number of similar elements (tunnel or bridge segments).
Production lines are exemplary for mass production in manufacturing but unusual in construction.
Products are stationary in workshops and the required equipment and labor are brought to the product as required. The consecutive activities vary in type and intensity. A typical example is a garage where cars are repaired. A workshop in construction might be a room in a building where different activities are carried out by different trades. In a garage, the mechanics are doing all the work; in a constructed room we find first the concrete and rebar people, then electricians, plumbers, tilers, joiners, and painters.
A construction site encompasses many workshops and the activities at the different ones are interlinked; coordination thus becomes a problem. While production lines feature technical coordination, management coordination is the choice on construction sites. The output per site does not allow the magnitude of investment that is characteristic of mass production.
One management answer to the coordination problem is scheduling, another lean construction. In lean construction, the sequence of activities is fixed (same as scheduling) but the resources are also aligned in such a way that all successive activities in one area take the same amount of time. Thus, a production train with an engine and coupled trades as wagons pass through the building or structure at constant speed. There are similarities to the production line (constant speed) while in contrast, labor and equipment are mobile and the product remains stationary.
These determinants influence productivity, flexibility, and susceptibility to interference. There is a trade-off between productivity on the one side and flexibility/susceptibility to interference on the other side. Mass production in a factory is shielded against interference. On the other hand, an owner who is present on the construction site every day will frequently interfere to achieve the intended results. Other potential causes of interferences in construction are the soil conditions, the embeddedness of the construction site into the social and ecological environment, as well as weather conditions: production in construction must be flexible.
微观经济学代考
经济代写|微观经济学代写Microeconomics代考|General Characteristics
今天的市场(不仅在建筑市场)主要是买方市场。购买者决定公司的成功。在产品短缺的时候,市场会变成卖方市场。这曾经是共产主义国家的普遍情况,也是二战后欧洲的普遍情况。供需同时决定数量和价格的思想着重于买卖双方的互动。这种平衡在施工中转向业主的产品设计。图 12.11 描述了产品设计如何决定承包商的输出;转变方向不是从投入(生产要素)到产出(结构),而是相反。
承包商的生产特征与交换品制造的生产特征有很大不同(表 12.4)。
总部和站点的分离导致信息和控制问题。装配工作需要劳动力的日常运输或现场住宿,对私人生活有影响;运输需要额外的金钱和时间;激励影响是可能的。低股权限制了生产要素的融资;结果不是最好的,但使用了可用的设备。帐户的差异有时会导致无法比较的数据集。交付到不同地点的小批量、短期采购会增加成本并使物流更加复杂。生产前的营销(收购)是合同货物的典型做法,会导致与信息不对称相关的所有问题,包括机会主义。项目组织通常更复杂,不允许分摊固定成本,因此,不保证详细规划或购买特定资产。按需、单批、现场生产都增加了生产复杂度;网站制作也取决于天气。所有者的集成导致多个问题。他必须知道他的贡献(过程证据)并且必须按时提供。从承包商的角度看,业主是生产要素,从业主的角度看恰恰相反。施工过程的劳动强度导致动机、技能和信息的重要性增加。他必须知道他的贡献(过程证据)并且必须按时提供。从承包商的角度看,业主是生产要素,从业主的角度看恰恰相反。施工过程的劳动强度导致动机、技能和信息的重要性增加。他必须知道他的贡献(过程证据)并且必须按时提供。从承包商的角度看,业主是生产要素,从业主的角度看恰恰相反。施工过程的劳动强度导致动机、技能和信息的重要性增加。
有些事情是承包商无法控制的。业主行为、土壤条件和天气都会以不可预测的方式影响生产过程。由于这些外部影响,生产结果是随机分布的。劳动力的积极性对生产也有很大且多变的影响。供应链碎片化对生产的影响远大于制造业。对生产的主要影响如图 12.12 所示。
经济代写|微观经济学代写Microeconomics代考|Production Determinants
这些面向过程的决定因素受到生产地点和支持生产的可能性的影响。表 12.5 提供了这些决定因素的特征。
生产线的特点是在从一个工作站移动到另一个工作站时组装产品。当产品移动时,劳动力和设备是静止的。生产线需要详细的规划和高投资。每个工作站的活动都是重复的。我们只能在具有大量相似元素(隧道或桥梁段)的隧道或桥梁等大型项目中找到施工中的生产线。
生产线是制造业大规模生产的典范,但在建筑业却不常见。
产品固定在车间,所需的设备和劳动力根据需要带到产品上。连续活动的类型和强度各不相同。一个典型的例子是修理汽车的车库。建筑车间可能是建筑物中的一个房间,不同的行业在其中进行不同的活动。在车库里,机械师正在做所有的工作;在建造好的房间里,我们首先看到的是混凝土和钢筋工人,然后是电工、水管工、瓷砖工、细木工和油漆工。
一个建筑工地包含许多车间,不同车间的活动相互关联;协调因此成为一个问题。生产线的特点是技术协同,而管理协同则是工地的选择。每个站点的输出不允许大规模生产所特有的投资规模。
协调问题的一个管理答案是调度,另一个是精益建设。在精益建设中,活动的顺序是固定的(与调度相同),但资源也以这样一种方式对齐,即一个区域中的所有连续活动都需要相同的时间。因此,当货车以恒定速度穿过建筑物或构筑物时,带有发动机和耦合贸易的生产列车。与生产线(恒定速度)有相似之处,而相反,劳动力和设备是移动的,而产品保持静止。
这些决定因素会影响生产力、灵活性和对干扰的敏感性。在一方面的生产力和另一方面的灵活性/对干扰的敏感性之间存在权衡。工厂的大规模生产不受干扰。另一方面,每天都在施工现场的业主会经常干预以达到预期的结果。施工中干扰的其他潜在原因是土壤条件、施工现场对社会和生态环境的嵌入以及天气条件:施工中的生产必须灵活。
统计代写请认准statistics-lab™. statistics-lab™为您的留学生涯保驾护航。
金融工程代写
金融工程是使用数学技术来解决金融问题。金融工程使用计算机科学、统计学、经济学和应用数学领域的工具和知识来解决当前的金融问题,以及设计新的和创新的金融产品。
非参数统计代写
非参数统计指的是一种统计方法,其中不假设数据来自于由少数参数决定的规定模型;这种模型的例子包括正态分布模型和线性回归模型。
广义线性模型代考
广义线性模型(GLM)归属统计学领域,是一种应用灵活的线性回归模型。该模型允许因变量的偏差分布有除了正态分布之外的其它分布。
术语 广义线性模型(GLM)通常是指给定连续和/或分类预测因素的连续响应变量的常规线性回归模型。它包括多元线性回归,以及方差分析和方差分析(仅含固定效应)。
有限元方法代写
有限元方法(FEM)是一种流行的方法,用于数值解决工程和数学建模中出现的微分方程。典型的问题领域包括结构分析、传热、流体流动、质量运输和电磁势等传统领域。
有限元是一种通用的数值方法,用于解决两个或三个空间变量的偏微分方程(即一些边界值问题)。为了解决一个问题,有限元将一个大系统细分为更小、更简单的部分,称为有限元。这是通过在空间维度上的特定空间离散化来实现的,它是通过构建对象的网格来实现的:用于求解的数值域,它有有限数量的点。边界值问题的有限元方法表述最终导致一个代数方程组。该方法在域上对未知函数进行逼近。[1] 然后将模拟这些有限元的简单方程组合成一个更大的方程系统,以模拟整个问题。然后,有限元通过变化微积分使相关的误差函数最小化来逼近一个解决方案。
tatistics-lab作为专业的留学生服务机构,多年来已为美国、英国、加拿大、澳洲等留学热门地的学生提供专业的学术服务,包括但不限于Essay代写,Assignment代写,Dissertation代写,Report代写,小组作业代写,Proposal代写,Paper代写,Presentation代写,计算机作业代写,论文修改和润色,网课代做,exam代考等等。写作范围涵盖高中,本科,研究生等海外留学全阶段,辐射金融,经济学,会计学,审计学,管理学等全球99%专业科目。写作团队既有专业英语母语作者,也有海外名校硕博留学生,每位写作老师都拥有过硬的语言能力,专业的学科背景和学术写作经验。我们承诺100%原创,100%专业,100%准时,100%满意。
随机分析代写
随机微积分是数学的一个分支,对随机过程进行操作。它允许为随机过程的积分定义一个关于随机过程的一致的积分理论。这个领域是由日本数学家伊藤清在第二次世界大战期间创建并开始的。
时间序列分析代写
随机过程,是依赖于参数的一组随机变量的全体,参数通常是时间。 随机变量是随机现象的数量表现,其时间序列是一组按照时间发生先后顺序进行排列的数据点序列。通常一组时间序列的时间间隔为一恒定值(如1秒,5分钟,12小时,7天,1年),因此时间序列可以作为离散时间数据进行分析处理。研究时间序列数据的意义在于现实中,往往需要研究某个事物其随时间发展变化的规律。这就需要通过研究该事物过去发展的历史记录,以得到其自身发展的规律。
回归分析代写
多元回归分析渐进(Multiple Regression Analysis Asymptotics)属于计量经济学领域,主要是一种数学上的统计分析方法,可以分析复杂情况下各影响因素的数学关系,在自然科学、社会和经济学等多个领域内应用广泛。
MATLAB代写
MATLAB 是一种用于技术计算的高性能语言。它将计算、可视化和编程集成在一个易于使用的环境中,其中问题和解决方案以熟悉的数学符号表示。典型用途包括:数学和计算算法开发建模、仿真和原型制作数据分析、探索和可视化科学和工程图形应用程序开发,包括图形用户界面构建MATLAB 是一个交互式系统,其基本数据元素是一个不需要维度的数组。这使您可以解决许多技术计算问题,尤其是那些具有矩阵和向量公式的问题,而只需用 C 或 Fortran 等标量非交互式语言编写程序所需的时间的一小部分。MATLAB 名称代表矩阵实验室。MATLAB 最初的编写目的是提供对由 LINPACK 和 EISPACK 项目开发的矩阵软件的轻松访问,这两个项目共同代表了矩阵计算软件的最新技术。MATLAB 经过多年的发展,得到了许多用户的投入。在大学环境中,它是数学、工程和科学入门和高级课程的标准教学工具。在工业领域,MATLAB 是高效研究、开发和分析的首选工具。MATLAB 具有一系列称为工具箱的特定于应用程序的解决方案。对于大多数 MATLAB 用户来说非常重要,工具箱允许您学习和应用专业技术。工具箱是 MATLAB 函数(M 文件)的综合集合,可扩展 MATLAB 环境以解决特定类别的问题。可用工具箱的领域包括信号处理、控制系统、神经网络、模糊逻辑、小波、仿真等。